The Planning Commission should not pass the EIR until this study is finished. In addition, the bacterial situation within the pipes should be further examined. There is a discharge vault that has some 20,000 MPN bacteria within it. The implications of Poseidon operations on these bacterial levels should be clarified before approval of the EIR, because these bacterial levels may very well reach the beach. Hope to see you tomorrow night, even if you are there simply to observe the process. Thanks. Jan Vandersloot (949) 548-6326 Back to T.O.C. 3
|
|